Project Description
Year: 2014
Client: Nardis Co.
Services: EPC
Location: Baghdad, Iraq
Scope of Contract
Design and manufacture of control system of Al-Sadder Gas Power Plant (2×160 MW)
Main activities
| System Type | SIEMENS SIMATIC S7-300 (Software Redundancy) |
| Programming | SIMATIC Step7+WinCC |
| Stations | 1x Engineering Station / Operator Station |
| Network | Ethernet , Profibus-DP, Modbus |
| Physical Layer | Electrical |
| Number of I/Os | 400 I/Os with 1 Control Panel |