Yazd Tire Co. Rubber Mixing Lines (Banbury) DCS Systems Renovation

//Yazd Tire Co. Rubber Mixing Lines (Banbury) DCS Systems Renovation
Yazd Tire Co. Rubber Mixing Lines (Banbury) DCS Systems Renovation2019-02-05T10:02:46+03:30

Project Description

  • Year: 2007

  • Client: Yazd Tire Co.

  • Services: EPC

  • Location: Yazd, Tehran

Scope of Contract

  • Engineering, Procurement & Construction of DCS systems
  • PLC Programming (SIMATIC S5 to S7)
  •  Design and Implementation of Monitoring System For Weighing System, Mixer, Extruder, Twin Mill
  • Programming WINCC Software & Local HMI for 5 station and Networking (2000 I/O s)
  • FAT & SAT Training

Main activities

System Type SIEMENS SIMATIC  CPU 315-2DP
Programming SIMATIC Step7,WinCC
Stations 2 OS  & 1 Eng.  St. and 3 Local Station
Network Ethernet , Profibus-DP, Modbus
Physical Layer Electrical
Number of  I/Os 2000  I/Os with 6 Control Panels
Scope Engineering, Programing, Manufacturing and Commissioning