Qeshm 50 MW Power Plant

/, Transmission line/Qeshm 50 MW Power Plant
Qeshm 50 MW Power Plant2019-02-05T17:46:41+03:30

Project Description

  • Year: 2013

  • Client: Iranian Offshore Oil Company (IOOC)

  • Services: EPC

  • Location: Qeshm Island, Iran

Scope of Contract

  • Basic & detail engineering
  • procurement & construction of control building & turbine hall (foundation & cabling,…)
  • Supplying the required machines for installation and commissioning of 5 Solar Turbo Generators
  • Design and implementation of 20 KV transmission line
  • Basic & detail engineering, procurement & supply & execution of the Qeshm Power Plant utilities

Main activities

In 2013 Rasmara won the tender for EPC contracting services of Qeshm 50 MW power plant.  The plant, whose area is about 23,000 square meters, is located within Qeshm onshore facilities site in Qeshm island.

The project has been proceeded in each phase as follows, with overall progress of 54%.

Mechanical

  • Installation of GTGs :

    • 5 × 5MW ( 5 × 80 Ton )
    • 2 × 14MW ( 2 × 130 Ton )
  • Procurement & installation of fuel gas skid :

    • 2 × 15 MMSCFD
  • Procurement & installation of fuel oil main tank, daily tank, pump stations

  • Procurement & installation of air compressor packages:

    • 2× 250 m3/hr (2× 10 Ton)
  • Procurement & installation of overhead crane :

    • 2× 35 Ton

Electrical

  • Diesel Generating Sets :

    • 2 × 1000 kVA
    • 1 × 3200 kVA
  • MV switchgears : 44 cells

  • LV switchgears : 20 cells

  • Lighting and distribution boards : 20 cells

  • Transformers :

    • 3 × 15 MVA
    • 2 × 2 MVA
  • E & IC Cabling : 43km

  • 20 kV Overhead Line : 4km

  • Plant Control System : DCS,ESD,PMS,F&G

  • Field Instrumentation

Civil

  • Turbine Hall Shelter : 2500 m2

  • Sub station & Control room: 2200 m2

  • Total Concrete Work : 6,500 M3

  • Earth Work: 40,000 M3

  • Asphalt Road : 1000 m

  • Fence : 700 m

Piping

  • Welding: 15000 ID

  • RT: 7000 ID

  • Gas Pipe line : 2Km

  • Flare line : 2Km

  • Fire Fighting Net : 1.8 Km

  • Hydro Test: 60,000 In-m

  • Paint: 2500 m2

  • UG Coat & Wrap: 2800 m2