Project Description
Year: 2020
Client: Abadan Refinery
Service: EPC
Location: Abadan, Khuzestan, Iran
Scope of Contract
Project scope of work includes designing, procurement, construction, installation, testing and commissioning of the main and new indoor substation, including: GIS 33 and 11 KV power switches – AIS switches with 0.4 kV voltage level, power transformers, cabling (power, control), HVAC system, fire alarm, PMS, DC charging, UPS, lighting (normal, emergency) and the main building of the substation, office space, cable gallery, control room, etc…
Scope of supplies
Description | QTY | UNIT |
33 KV GIS SWITCHGEAR | 45 | CELL |
11 KV GIS SWITCHGEAR | 39 | CELL |
LV SWITCHGEAR | 17 | CELL |
CONTROL PROTECTION AND METERING PANELS for 33KV PANELS | 12 | CELL |
CONTROL PROTECTION AND METERING PANELS for 11KV PANELS | 11 | CELL |
LVAC AND LVDC PANELS | 4 | CELL |
PROTECTION RELAYS FOR 11KV FEEDERS | 13 | NO. |
Description | QTY | UNIT |
LIGHTING & SMALL PANELS | 5 | CELL |
POWER TRANSFORMER 33/11 KV, 40 MVA | 1 | SET |
DISTRIBUTION TRANSFORMER 33/0.4 KV, 2 MVA | 2 | SET |
BUSDUCT LV | 2 | SET |
NGR + CTs | 3 | SET |
CAPACITOR BANK | 2 | CELL |
AC UPS + DC CHARGER AND BATTERIES | 2 | SET |